Aligned Elements Web Client User Manual
3.1.272.24402
3.1.272.24402
  • Introduction
  • Basic Concepts
  • Get Started
    • Activate your Aligned Elements Account
    • Log In
    • Open a Project
    • Change Project
    • Create a new Project
    • The Project Start Site
    • Your Assigned Items
    • Manage Your User
    • Log Out
    • Enter Design Control Items
      • Work with Chapters
      • Work with Table Attributes
      • Inserting Images in Attributes
      • Working with Traces
      • Add Issues
      • Add Attachments
      • Collaborate using Comments
      • Favourites
      • Find in... Actions
      • Inconsistencies and Positive Cues
  • Document Object Actions
    • Move and Rearrange Chapters and Document Objects
    • Update Multiple Items
    • Generate Design Control Items
    • Copy Design Control Items
    • Lock Document Objects
    • Generate Reports
    • Export Document Objects
    • Import Document Objects
    • Copy Document Objects between Projects
    • Import Files
  • Explorers and Views
    • Project Explorer
    • File Explorer
    • Trace Explorer
    • Test Run Explorer
    • Project History
    • Chapter View
    • List View
    • Search Result View
    • Export to Excel in Grids
  • Project Status
    • Display Inconsistencies
    • Display Consistency Coverage
    • Display Risk Summary
    • Display DHF Index
  • Queries
    • Run a Query
    • Design a Query
    • Query Filters
  • Charts
    • Display a Chart
    • Design a Chart
  • Trace Tables
    • Run a Trace Table
    • Design a Trace Table
  • Work with Documents
    • Adding Word Document to File Objects
    • The Word Add-in. Adding Design Control Items to Documents
    • Sign Documents with Electronic Signatures
    • Save Files to Disk
    • Released Document View
  • Design Reviews
    • Conduct a Design Review
  • Risk Analysis
    • Perform a FMEA Risk Assessment
    • Perform a Preliminary Hazard Analysis
    • Relative vs. Absolute Mitigations
    • Potential Hazard
    • Using the Risk Analysis to assess the Software Safety Classification
  • Manage Tests
    • Test Runs
      • Planning a Test Run
        • The Burndown Chart
      • Executing a Test Run
      • Completing a Test Run
      • Test Run Functions
      • Test Runs and Linked Projects
      • Caching of Test Runs and Test Run Explorer
    • Classic Tests
  • Work with Tags
    • Add Tags
    • Filter views on Tags
    • Edit Tags
    • Tags and Snapshots
  • Assistants
    • Run an Assistant
  • Snapshots
    • Create a Snapshot
    • Display a Snapshot
    • Compare Snapshots
  • Settings
    • Project Information
    • Manage Users
    • Manage User Groups
    • Project Settings
    • Project Hierarchy
      • Branch Projects
      • Merge Projects
    • Unlock Objects
  • Dashboards
    • Select a Dashboard
    • Create a Dashboard
    • Remove a Dashboard
  • AI Features
    • AI Features in Aligned Elements
  • Aligned Elements Automation Tool
    • The Automation Tool
  • Web Administrator Tools
    • Manage Projects
    • Rename, Copy or Remove Project
    • Manage Users
    • Manage Permissions
    • Register a new Administrator
    • Inspect User Logs
    • Manage Templates
    • Download Log Files
  • Manage Service Configuration
  • Configure a Type Name Change
Powered by GitBook
On this page
  • All Items
  • Assigned Reviews
  • Assigned Signatures
  1. Get Started

Your Assigned Items

In the Navigation Bar, the Your Assigned Items section contains lists of Item assigned to you.

All Items

This list contains all items assigned to you, including those in linked projects.

Note! The result here may differ from Assigned Reviews and Assigned Signatures since a more generic query is used; i.e., all reviews and signatures where the current user is assigned are listed regardless of if the user has already completed his/her tasks.

Assigned Reviews

This list contains Open Reviews to which you are assigned as one of the review participants and still have not completed your Review tasks.

You can click on the Add Feedback button to open the Review Feedback view and start entering feedback.

Assigned Signatures

The list contains open Signature Document Objects where you are an assigned signee and still have not signed the Document.

You can click the Sign button to sign the document.

PreviousThe Project Start SiteNextManage Your User

Last updated 11 days ago